Chapter 5
PolyLEVEL
®
Polyurethane Foam and Resin
APPENDIX 5B
MODEL SPECIFICATIONS
7.8 The rate and quantity of material required will be determined by the Installing Contractor and
approved by the Owner.
8
INSTALLATION RECORD SUBMITTALS
8.1 The Installing Contractor shall provide the Owner copies of the polyurethane material usage
record within 24 hours after each installation section has been completed. Formal copies shall
be submitted within 30 days following the completion of the polyurethane installation. The
material usage record shall include, but is not limited to, the following information:
8.1.1 Date and time of installation
8.1.2 Location of installation
8.1.3 Total material used
8.1.4 Comments pertaining to interruptions, obstructions, other relevant information
9
CLEANUP
9.1 With one week of completion of the work, the Installing Contractor shall remove any and all
material, equipment, tools, debris, of other items belonging to the Installing Contractor or used
under the Installing Contractor’s direction.
10
METHOD OF MEASUREMENT
10.1 The high-density polyurethane material shall be measured by the pound. Weight of the injected
material will be recorded and documented at each location and at the end of each work shift.