Chapter 5
PolyLEVEL
®
Polyurethane Foam and Resin
APPENDIX 5B
MODEL SPECIFICATIONS
10
CLEANUP
10.1 With one week of completion of the work, the Installing Contractor shall remove any and all
material, equipment, tools, debris, of other items belonging to the Installing Contractor or used
under the Installing Contractor’s direction.
11
METHOD OF MEASUREMENT
11.1 The high-density polyurethane material shall be measured by the pound. Weight of the injected
material will be recorded and documented at each location and at the end of each work shift.