Saber Foundation & Concrete Repair Before & After Photos
Click on a photo to enlarge.
Column Separation from Ceiling Rialto, Ca
Sinking slab caused post on the railing to separate from the ceiling over time.
Smart Jacks in Altadena, CA
The Before picture shows a home with a sagging floor due to lack of support posts.
The After picture shows Saber adding all metal Smart Jacks to fix this issue.
Push Pier in Altadena
The before photo shows the hole being prepared for a Push Pier.
The after photo shows the push pier installed.
PolyLevel(R) Fills Voids in Downey
The Before picture shows a concrete area, that is cracking due to void formation underneath it.
The After picture shows a crew member Filling the Void with Polyurethane. This is being done by using our State-of-the-Art PolyLevel Injection Process.
Concrete Removal and Replacement Cypress, Ca
The Before picture shows a space where Saber excavated a badly cracked slab. This was a trip hazard.
The After picture shows the newly poured slab.
