Job Stories
Concrete Encased Piers to Lift Home in Huntington Beach, Ca
A homeowner in Huntington Beach, Ca was seeing symptoms of settling in the home he had lived in since 1987. The home, built in 1976, was experiencing drywall and stucco cracks both inside and outside the home. The homeowner and his wife wanted to build an addition to the home, but needed to level or lift the home's foundation before they could move forward.
Saber's project design specialist used zipline and other readings to determined how far their foundation had settled. Saber found that the couple's home had been experiencing general foundation distress and the present soil conditions promoted settlement that was likely to continue over time.
The homeowner and his wife wanted to remedy the issue with their home as soon as possible, so Saber's production team started soon. They were to install 10 288 Low Profile Push Piers in designated areas around the home to level and attemp to lift the home. Each pier was encased in concrete by a third party, not jeopardizing any warranties on the piers themselves.
At the beginning of the job, landscaping had to be removed from each of the pier locations. Soil was then excavated at each pier location at the bottom of the foundation footing. Along with the installed push piers, 42 units of PolyLevel void filling was installed beneath the footing. Polylevel void fill (210 units) was also inserted beneath the slab foundation to further reinforce the home and stabilize the soil.
Beneath the home's sliding glass door to their patio a pier couldn't be placed, so a steel beam was installed beneach the jamb, so that there woul dbe no damage to the footing. Once the project was complete, the foreman walked the entire jobsite with the homeowner, asking if he or his wife had any questions. They did not and were happy with the final result of closed drywall cracks and a level home.
Sagging Floors and Seismic Retrofitting in Huntington Beach
Huntington Beach resident Marlette contacted Saber in regards to Sagging Floors in her home. She stated that her home was built in 1958. Marlette also stated that she wanted to update her home for her grandchildren. Saber's Project Design Specialist performed a thorough inspection of Marlette's home.
Saber's crew installed several Seismic Retrofitting components to the Foundation and the Home. These components strengthened the connection between Marlette's Home and it's Foundation. The attached Picture shows the Seismic Retrofitting Universal Foundation Plate attached to the A35 Framing Angle. We then added Smart Jacks, to support the sagging floor joists.
Marlette was pleased with the results and the crew's clean up.
Push Piers to the Rescue in Huntington Beach
Huntington Beach resident Donna P. contacted Saber regarding Large cracks in the walls of her home. The attached picture shows one of the exterior cracks in Donna's home. The cracks were growing bigger and Donna was worried about her safety. Her home was built in 1973. Saber's Project Design Specialist performed a complete Free Homeowners inspection. Donna had three other quotes. She decided to have Saber fix her home properly and for the long term.
Our Crew dug holes down to the base of the home's concrete slab Foundation. Then we attached three Push Pier Systems. Our crew Pressurized the Push Piers, thus lifting the sunken areas of the Foundation. The Foundation now has a constistant elevation throughout. The we filled in all holes and poured concrete. Last of all we cleaned up our work areas.
Donna now feels safe. She has peace of mind.
Trip Hazards in Huntington Beach
Huntington Beach resident Beverly W. contacted Saber regarding Cracked Walkways and Driveway at her home. Please see the attached picture. Saber's Project Design Specialist determined, that these Trip hazards could be fixed with Concrete Grinding.
Tree and Bush roots were removed, and some on the Concrete was replaced. The rest of the Concrete was ground down to a Consistent Elevation. All Trip Hazards were Eliminated.
CleanSpace in Huntington Beach
Joe D. was interested in encapsulating the crawl space of his Huntington Beach home. Dirt crawl spaces contain moisture, which can bring mold or rot, as well as increase energy bills. Not only did Joe want to address these issues, he wanted to be able to use his crawl space for storage. Project Design Specialist Daniel G. recommended CleanSpace as the right solution for Joe's crawl space. Joe is moving forward with his project and gave Daniel a stellar review, stating "Very thorough assessment and knowledgeable staff."
Seismic Retrofit in Long Beach
Customer Mari D, of Long Beach, California, had been considering reinforcing her property, and with the string of recent earthquakes in and around the Los Angeles area, she found that now was a better time then any. So, Mari did her research and found that Saber was the best company to come evaluate her property. Upon the inspection, the Sales representative from Saber proposed to install Simpson UFP 10 brackets at every corner of the foundation and every 6' from the center, as well as strapping each 4x4 post to each existing wood grinder beam, using Simpson T-straps and Simpson framing clips. There was also a crack in the slab that was a concern to Mari, therefore; it was suggested that the crack be routed, cleaned and repaired using a two component epoxy injection method.
Mari found that this was the best option for her, so she scheduled to have a crew from Saber repair the crack in her slab and retro fit her property. The crew was able to complete the project in the first day. They began by going into the crawlspace where the work would be preformed, and installed and secured the T-straps, they then installed and secured the sill plates and repaired the crack with epoxy.
Mari was very pleased with the work completed. It is safe to say, she now has piece of mind knowing that in the occurrence of the next earthquake in her area, her home has been safely secured.
Seismic Retro-Fit and Helical Pier Installation
In Los Angeles, California, Saber Foundations was contracted to complete a job on a structure that had suffered from severe foundation settlement. During the initial inspection it was also recommend that the property be retro-fitted with vertical and horizontal “I” beams. The settlement that was occurring on this structure was most likely due to the shifting in the supporting soils beneath the foundation. Using Foundation Supportworks, Inc, Push Piers made of steel and including a set of helical blades in the lower section of the pier, these are known as Helical Piers. Soil is removed from around the foundation footing for proper pier placement. Helical pier systems create a solid supporting base that transfers the weight of a structure downwards to strong supporting soils. These piers are mechanically advanced into the soil using small construction equipment or hand equipment. As they are installed to appropriate depths and capacities, they prevent any future settlement from occurring. Once the proper depths are achieved, heavy duty steel foundation brackets are positioned below and against the foundation footing. The weight of the structure is then transferred through the helical piers to deep, competent soils. Lifting the structure back towards its original position is then attempted. Then, the soil around the foundation is carefully replaced.
During this installation, because of the size of the building and the length of the walls, 100 helical piers were installed to the exterior and interior of of the property. These piers worked together to transfer the weight of the structure to the strong soils or bedrock below. After installation, the owner will notice that any signs of the soils shifting will no longer be an issue. This property was also retro-fitted with vertical and horizontal steel “I” beams. This process involves the installation of engineered metal connectors and other reinforcement materials at key stress points throughout the properties structure. The goal of the retrofitting process is to counteract three main earthquake-induced forces that can cause major damage to a building. Saber’s experienced crew utilized the vertical and horizontal “I” beams to keep the properties structure together in spite of any seismic force that could easily tear an un-reinforced property apart. The owner is not content with the fact that the property is once again stable and has been reinforced in the event of another earthquake, which in California is inevitable.
Foundation Leveling using Push Pier Support
Customer Olivia M, of Somis, California, and her husband purchased their 1980’s home a year prior, fully knowing it had foundation settlement issues. Researching the available options, Olivia determined that Saber had the best online reviews and would be the best company to evaluate the property. Subject site is a single story home supported by a slab on grade foundation. Noticeable cracking in the foundation and flooring tile was evident as well as the floor was determined to be out of level. Upon inspection, Saber’s Project Specialist, Joe J. proposed to install 12 hydraulically driven steel Push Piers at 6’ intervals along the affected area to stabilize and lift the home back to it's original elevation.
Saber’s Foreman Trevar A and his crew completed the Push Pier installation in three days and performed lifting and leveling on the fourth day, followed by Polyurethane injection. Polyurethane was utilized to fill voids under the slab that were created during the lifting phase, further permanently supporting the foundation.
Another happy customer! Olivia was very pleased with the work completed. It is safe to say, she now has piece of mind knowing that the foundation of her home is stable.
Helical Piers, PolyLEVELâ„¢, crack repair and sill plate bolting in Granada Hills
Saber was contracted to repair a home in Granada Hills, California. The home had suffered from severe settlement issues, causing cracks to form in the interior and exterior of the home, and the walls to bow. The homeowners knew that they needed to get the home repaired before more settlement occurred and caused more issues. Saber was able to repair the foundation using the Helical Pier system, along with PolyLEVEL™ to fill the void once the lift was completed. This job required to concrete areas in the interior of the home to be removed to place the piers for the maximum stabilization. There was also some crack repair work completed by the Saber crew, as well as sill plate bolting done in the crawlspace of the home. The homeowners can no longer see the effects of the settling soils.
CleanSpace in L.A.
Homeowners in Los Angeles, were looking for ways to make their home more energy efficient and to keep moisture out of their homes crawlspace. After spending many hours researching the different ways to resolve their issues, they found that Saber and the CleanSpace encapsulation installed be Saber was the best option for them. CleanSpace encapsulation is a 20 mil thick plastic liner, similar to a pool liner that can be fitted in your crawlspace to completely seal off your home from the earth. The material is incredibly durable, will last as long as the home, and will stay in place. Not only does CleanSpace make the homes crawlspace moisture free, and makes the home more energy efficient it also adds space for storage. The Saber CleanSpace installation crew was scheduled to complete the project, they arrived at the site and went right to work. The crew installed 418sqft of CleanSpace to the homes crawlspace area. The process to install the CleanSpace began with the a dimpled polyethylene membrane under the CleanSpace liner which allows for water to flow to a sump in the crawlspace, once this is installed, the lining is then attached to the walls with fasteners that are permanently driven into the walls. The Saber crew worked diligently to complete the crawlspace. The homeowners can now not only enjoy the energy efficiency of the CleanSpace, but also the added benefits: CleanSpace has an antimicrobial additive manufactured into the material, which prevents mold growth on the liner. This additive is odorless and safe.
Total Job Stories: 679
