Before & After

Commercial Foundations Before & After Photos

Click on a photo to enlarge.

Saber Stabilizes Concrete at LAX After Rain Washout

A sinking concrete pad with heavy machinery caused a safety concern at Los Angeles International Airport, before it was stabilized and lifted back into place.

Helical Post in Walnut

The before photo shows the post and footing that needs to be replaced. 

The after photo shows the post and footing replaced.

Sagging Floor SmartJack System in Whittier, Ca

Whittier, Ca.

SmartJacks in Whittier, Ca

Whittier, Ca. Steel beam and SmartJack Support System in crawl space

Helical Pier Install to Close Crack and Reinforce Retaining Wall in Orange, Ca

Cracked and failing retaining wall needed helical piers and push pier installation.